ASD tug ST ELMO (BP75t – Built in 2011) was recently engaged in a successful operation in the East Mediterranean. The vessel was employed to provide ship-to-ship LNG towage duties and standby assistance along with tug Gariblado in IPL and OPL Limassol Bay, Cyprus. St Elmo returned to base on 13th July, 2013.
For the purpose of this job tug Master Kenneth Linwood has undergone simulator training in Philadelphia – USA organised by BP.